Answer: In section 1 of SIPSO, in the field “Evaluation Date” you must enter the suggested evaluation date, considering the time established by document RAC-3.0-01 Accreditation Service Rules, “If the CAB wishes to coincide the evaluation for the extension with a follow-up evaluation or a re-evaluation, the extension requests must be made at least three (3) months in advance of the date scheduled for the next evaluation, that is the date scheduled for the documentary review stage”.
Verify the status of an accreditation by typing the accreditation code below:
El código de acreditación contiene la siguiente estructura:
AA-NNN-###
AA = Año solicitud
NNN = Abreviatura del esquema
### = Consecutivo asignado
📢 Estimados OEC CDA Y CRC:
Queremos informarles que actualmente estamos presentando una dificultad técnica que está generando demoras en algunos reportes al RUNT relacionados con los servicios de CDA y CRC.
Estamos trabajando para resolver esta situación y normalizar el servicio lo antes posible. Nuestro equipo técnico ha priorizado este tema para minimizar cualquier impacto.
Agradecemos su comprensión y ofrecemos excusas por los inconvenientes ocasionados. Seguiremos comprometidos con brindarles un servicio confiable y oportuno.
Gracias por su paciencia y confianza.
⚠️ CIRCULAR EXTERNA Nº 10-2026
Estimado Profesional,
Conoce los nuevos lineamientos para la radicación de cuentas de cobro y facturas electrónicas. Consulta la Circular aquí.